Stadlau and Hirschstetten

We delivered the planning guidelines for the renewal work of the A23 in the course of its general refurbishment in the section from Hirschstetten to Stadlau. The inventory survey was carried out fully coded and delivered in PlaDOK format, the Asfinag standard. The measurements were checked for their integrity on site by means of tablet. The project also includes the establishment of a homogeneous network of control points for further construction measures.

facebook Twitter Google+ Twitter



  • Field of activity: Cadastral surveying
  • Location: Vienna | AT
  • Project period: 2014
  • Client: ASFINAG
  • Work area: 3.3 ha
  • Cable length: 12.3 km
  • Subplots: 5


  • Creation of a reference system using GNSS
  • Second-order levelling
  • Network balancing of tachymetric and levelled control points
  • Fully coded survey with Geosi Asfinag interface
  • Checking for integrity using the Geosi Field Tablet on site and in real time
  • Floor and topographic plan M 1:200
  • DKM acquisition and conversion into PLaDOK format
  • Survey and incorporation of existing lines (gas, Wr. Netze, DLKM, post/telecom, etc.)
  • Incorporation of existing plans
  • Delivery in PLaDOK format