Austro Tower | Main collecting channel

The Austro Tower will be built along the airport motorway between the business district TownTown and the project TrIIIple. With a height of approx. 135 m and 38 floors, the Austro Tower will be the tallest tower in the area.
Immediately behind the construction site runs Vienna's right main collection channel and its discharge channel. To measure predicted elevations or settlements, a hose levelling instrument system was installed over the entire length of the construction site. It records all movements round the clock and alerts when limit values are exceeded. Measuring mirrors were also installed in 15 profiles to be able to tachymetrically measure deformations.
On-site inclinometer measurements are carried out to monitor the deformation of diaphragm walls.

facebook Twitter Xing Twitter

Boris Bogensberger and his team from Bogensberger Vermessung / Surveys installing a water hose level inside the main collecting channel next to the Austro tower in Vienna.

Installing a hose level - Austro Tower, Vienna | AT

Profile

  • Field of activity: Geomonitoring
  • Location: Vienna | Austria
  • Project period: 2018-2021
  • Client: Swietelsky Baugesellschaft m.b.H.
  • Tachymeter used: Leica TM 50
  • Inclinometer used: Geokon GK-604D
  • Number of tachymeter measuring points: 104
  • Number of hose levelling instruments: 10

Services

  • Construction work monitoring using digital hose levelling instruments and tachymeters
  • Alarm plan
  • Network measurements
  • Manual inclinometer measurements
  • Permanent vibration measurements