Beatrix bridge

The refurbishment of the Beatrix bridge over Austria's most traveled high-speed rail route between Vienna's districts of Meidling and Floridsdorf required permanent monitoring of the track areas and abutments. In order to avoid interfering with ongoing rail operation during the injection of abutments, individual areas were monitored at minute intervals. The installation of the sensors was difficult: directly on the track area, but outside of the deformation range.

facebook Twitter Xing Twitter

The DiMoSy geomonitoring system by Bogensberger Vermessung / Surveys monitoring the railway tracks and abutments underneath the Beatrix bridge.

DiMoSy - Beatrix bridge, Vienna | AT

The web interface of the geomonitoring system DiMoSy displaying the data of the Beatrix bridge.

DiMoSy web interface - Beatrix bridge, Vienna | AT

Profile

  • Field of activity: Geomonitoring
  • Location: Vienna | AT
  • Client: Swietelsky
  • Project period: 2015
  • Duration: 4 months
  • Tachymeters used: Leica TM30 + TM50
  • Monitored measuring points: 60
  • Measuring interval: From 1 minute to 6 hours

Services

  • Creation of a reference point network
  • Staking out of detail points with high accuracy (construction support)
  • Construction work monitoring with tachymeters (Leica TM30 and TM50)
  • Vibration measurements
  • Alarm plan
  • Automated activity logging