Main sewage treatment plant

We supported the reconstruction and expansion of the main sewage treatment plant in Vienna, from stakeout work to height markers for excavation support and construction phases. This involved monitoring the basins and septic tanks for settlements and tilting. The greatest challenge was: optimally equipping the individual structures with sensors without interfering with ongoing operation.

facebook Twitter Xing Twitter

Boris Bogensberger is installing the DiMoSy monitoring system at the construction site of the main sewage treatment plant Vienna.

DiMoSy - Main sewage treatment plant, Vienna | AT

Bogensberger Vermessung Geomonitoring Hauptkläranlage Meos Projekt2
Boris Bogensberger is installing the DiMoSy monitoring system at the construction site of the main sewage treatment plant Vienna.

DiMoSy - Main sewage treatment plant, Vienna | AT

Profile

  • Field of activity: Geomonitoring
  • Location: Vienna | AT
  • Project period: 2015-2017
  • Client: Gebrüder Haider Bau GmbH
  • Tachymeters used: Leica TM 50
  • Number of tachymeter measuring points: 56
  • Number of hose leveling instruments: 30
  • Measuring interval: Hourly to daily

Services

  • Construction work monitoring using digital hose leveling instruments and tachymeters
  • Alarm plan
  • Reference network measurements
  • Settlement measurements
  • Planning reviews
  • Stakeout work