Erste Campus

The Erste Campus will be the new headquarters of Erste Bank from 2016. Bogensberger supervised the project on the premises of the former south railway station from excavation of the construction pit up to finalisation of the facade. More than 40,000 points were staked out, both for the framework and for facade and steel construction. Settlement measurements were done at regular intervals. To identify movement in the soffit framework, our geomonitoring system "DiMoSy" was used. This allowed the halfway ÖNORM tolerances to be achieved.

facebook Twitter Google+ Twitter

Bogensberger_Surveys_Erste_Campus_3928_Projectpicture.jpg

Erste Campus, Vienna | AT

Bogensberger_Surveys_Erste_Campus_3928_Projectpicture.jpg

Erste Campus, Vienna | AT

Bogensberger_Surveys_Erste_Campus_3973_Projectpicture

DiMoSy - Erste Campus, Vienna | AT

Profile

  • Field of activity: Engineering surveying
  • Location: Vienna | Austria
  • Project period: 2012-2014
  • Client: Granit, SFL, Waschka
  • Construction costs: €300 million
  • Surveying services: > €1,000,000
  • Land area: 25,000 m2
  • Usable area of building: 117,000 m2
  • On-site employees: 7

Services

  • Staking out >40,000 detail points with high accuracy
  • Frictionless project management with all clients
  • Stakeout and establishment of complicated geometries (partition walls, curves and facade elements)
  • Settlement and lifting measurements at the centres throughout the entire construction period
  • Laser scanning as planning foundation for facade construction
  • Highly-precise facade surveying and stakeout
  • Precise fitting of steel elements in the concrete shell
  • Creation of a stress-free network of control points (approx. 1,065 fixed points)