Title
Title

ÖAMTC Headquarter

We have been fully overseeing construction of the ÖAMTC headquarter since the start of construction work. Noteworthy is the coordination of the measuring teams for all subcontractors and trades (steelwork, interior fittings, concrete construction, electrics, fitters, façade construction, etc.). 3D laser scanning was used for the planning of complex façade elements.

facebook Twitter Google+ Twitter

Bogensberger_Surveys_Öamtc_Headquarter_4084_Projektpicture

ÖAMTC headquarter, Vienna | AT

Bogensberger_Surveys_Öamtc_Headquarter_Projectpicture

ÖAMTC headquarter, Vienna | AT

Bogensberger_Surveys_Öamtc_Headquarter_60_Projektpicture

ÖAMTC headquarter, Vienna | Austria

Profile

  • Field of activity: Engineering surveying
  • Location: Vienna | Austria
  • Project period: 2015-2016
  • Clients: Granit, Unger Stahlbau, Reflex
  • Architect: Pichler & Traupmann Architekten ZT GmbH
  • Surveying services: €520,000
  • Usable area of building: 29,000 m2
  • On-site employees: 2-4 measuring teams

Services

  • Stakeout of >50,000 detail points with high accuracy
  • Frictionless project management with all clients
  • Stakeout and establishment of complicated geometries (partition walls, curves and facade elements)
  • Settlement and lifting measurements at the centres and peripheries throughout the entire construction period
  • Laser scanning as planning foundation for façade construction
  • Highly-precise façade surveying and stakeout
  • Precise fitting of steel elements in the concrete shell
  • Creation of a stress-free network of control points (approx. 300 fixed points)

Ähnliche Projekte

EN Durch die Nutzung dieser Website erklären Sie sich mit dem Setzen von Cookies einverstanden. Mehr

Schließen