Title
Title

Zillergründl Dam

The founding of Bogensberger Surveys in 1982 coincided with the construction of the Zillergründl pumped-storage power plant. The pilot project, the Zillergründl dam in Tirol, was followed by countless surveying projects all over Austria.

facebook Twitter Xing Twitter

Picture of the dam in Zillergründl.

Zillergründl dam, Zillergründl | AT

Picture of the dam in Zillergründl.

Zillergründl dam, Zillergründl | AT

Picture of the Zillergründl dam during construction in the early 1980s.

1982 - under construction, Zillergründl | AT

Profile

  • Field of activity: Engineering survey
  • Location: Zillergründl | AT
  • Project duration: 1974-1988
  • Client: HOFMAN & MACULAN
  • Net capacity: 86.7 million m³
  • Mean drop height: 696 m
  • Zillergründl reservoir height: 186 m
  • Max output: 360 MW

Similar projects

We use cookies to operate this website and to improve usability.More

Schließen