The founding of Bogensberger Surveys in 1982 coincided with the construction of the Zillergründl pumped-storage power plant. The pilot project, the Zillergründl dam in Tirol, was followed by countless surveying projects all over Austria.

facebook Twitter Google+ Twitter

Picture of the dam in Zillergründl.

Zillergründl dam, Zillergründl | AT

Picture of the dam in Zillergründl.

Zillergründl dam, Zillergründl | AT

Picture of the Zillergründl dam during construction in the early 1980s.

1982 - under construction, Zillergründl | AT

Profile

  • Field of activity: Engineering survey
  • Location: Zillergründl | AT
  • Project duration: 1974-1988
  • Client: HOFMAN & MACULAN
  • Net capacity: 86.7 million m³
  • Mean drop height: 696 m
  • Zillergründl reservoir height: 186 m
  • Max output: 360 MW